asturfeito

GRANTED PROJECTS

Advanced manufacturing of thick parts for the renewable energy sector

REF: IDE/2024/000482

The objective of this project is to study and design the incorporation of robotic welding processes in thick joints. It also aims to implement advanced scanning systems, typical of quality operations, in the welding process to facilitate the development of multi-pass welding programmes.

This project has been funded by SEKUENS (Agency for Science, Business Competitiveness and Innovation of the Principality of Asturias) and by the European Union through the European Regional Development Fund (ERDF).

Study of new welding technologies to improve efficiency in the manufacture of large parts for the offshore energy sector

REF: IDE/2023/000410

The aim of the project is to incorporate new welding processes associated with:

a) The study of finite element simulation techniques that enable deformation to be predicted.

b) Submerged arc welding (SAW) processes in deep thicknesses and circular geometries.

This project has been funded by SEKUENS (Agency for Science, Business Competitiveness and Innovation of the Principality of Asturias) and by the European Union through the European Regional Development Fund (ERDF).

Photovoltaic installation: Tabaza and PEPA Workshops

Nº EXPTE: AYUD/2021/49380     EBC/2021/B2/16

Project covered by the incentive programme linked to self-consumption and storage, with renewable energy sources, as well as the implementation of renewable thermal systems in the residential sector within the framework of the Recovery, Transformation and Resilience Plan, financed by the European Union-NextGenerationEU. #RecoveryPlan

 

  • TABAZA installation
  • Component: C7:I1
  • Total investment: €928.00
  • Amount of aid: €732.00
  • Installed power: 127.80 kWp
  • Royal Decree 477/2021

 

  • PEPA installation
  • Component: C7:I1
  • Total investment: €928.00
  • Amount of aid: €732.00
  • Installed power: 127.80 kWp
  • Royal Decree 477/2021

 

Implementation of energy saving measures in ASTURFEITO warehouses. PEPA and Tabaza

Improvements in energy efficiency focused on the replacement of lighting elements and the incorporation of batteries for the compensation and correction of consumption in the company’s 2 main workshops located in the PEPA in Avilés and Tabaza dedicated to metal transformation.

Research into the design of a solution for the new mobility system

Nº EXPTE: IDE/2021/000368

The aim of the project is to carry out a detailed study of the manufacturing process of the tubular structures of the new mobility system of the future.

This project has been funded by IDEPA (Institute for Economic Development of the Principality of Asturias) and by the European Union through the European Regional Development Fund (ERDF).

INNOSOLD: Innovative and efficient multi-pass and robotic additive manufacturing systems for offshore structures and subsea application

REF: IDI/2017/000126

OBJECTIVE: The general objective of this project is the research and development of new robotic welding and additive manufacturing technologies through the development of manufacturing processes that are more efficient, effective and competitive than traditional methods, obtaining greater energy efficiency and reducing polluting emissions.

This project has been financed by the Centre for the Development of Industrial Technology (CDTI) and by ERDF funds (ERDF operational programme for R&D&I by and for the benefit of companies – Technology Fund 2007-2013).

PROJECT FINANCED BY

Photovoltaic installation: Talleres Tabaza and PEPA

Nº EXPTE: AYUD/2021/49380     EBC/2021/B2/16

Project covered by the incentive programme linked to self-consumption and storage, with renewable energy sources, as well as the implementation of renewable thermal systems in the residential sector within the framework of the Recovery, Transformation and Resilience Plan, financed by the European Union-NextGenerationEU. #RecoveryPlan

 

TABAZA installation

  • Component: C7:I1
  • Total investment: €928.00
  • Amount of aid: €732.00
  • Installed power: 127.80 kWp
  • Royal Decree 477/2021

 

PEPA installation

  • Component: C7:I1
  • Total investment: €928.00
  • Amount of aid: €732.00
  • Installed power: 127.80 kWp
  • Royal Decree 477/2021

Photovoltaic installation. Silvota workshop.

Project under the incentive program linked to the in the framework of the Recovery, Transformation and Resilience Plan, funded by the EuropeanUnion-NextGenerationEU. #RecoveryPlan

REF: AYUD/2022/22219

Silvota Installation

Component: C7:I1 Total investment: 117.011,00 € Amount of aid: 29.252,75 € Installed power: 163,80 kWp

 

Advanced solutions for the integral management of production in the manufacturing of large parts

REF: IDE/2023/000387

The main objective is to achieve a Smart Factory, which provides flexibility and efficiency to the production process through the connectivity and interrelation of the entire value chain.

This project has been funded by SEKUENS (Agency for Science, Business Competitiveness and Innovation of the Principality of Asturias) and by the European Union through the European Regional Development Fund (ERDF).

OFFSHORE ENERGY SECTOR

Expansion of facilities and investment in capital and other equipment to improve competitiveness in the offshore wind energy sector.

Ref. IDE/2016/000608 PROYECTO SUBVENCIONADO POR  

VPSTTG -VPS for tidal turbine generators

Objective: This project is a key enabler in reducing the cost of tidal stream energy to enhance its market readiness and to make it commercially viable. It is developed in a consortium with SIMEC Atlantis Energy.

VPSTTG Project link: https://simecatlantis.com/vpsttg-project/ 

This project has received funding from the European Maritime and Fisheries Fund (EMFF) research and innovation programme under grant agreement No.EASME/EMFF/1.2.1.12/10/S12.789473.

Expansion of offshore wind energy facilities ide/2017/000740

Inversión en maquinaria y ampliación de instalaciones auxiliares para lograr una mayor capacidad de producción que permita satisfacer la creciente demanda de productos sector eólico offshore. Inversión ejecutada e instalaciones en pleno funcionamiento y rendimiento esperado

PROYECTO SUBVENCIONADO POR